5 – Design and Modelling of Urban Drainage Systems

Unit 5.5 Modelling Urban Drainage

Expected Study Load : 9 hours.


Introduction:

The main goal of this sub-unit is to provide insight into modelling urban drainage.

Learning Objectives:

Upon successful completion of this unit, the participants will be able to:

  • define  a ‘model’
  • discuss classification of models
  • discuss modelling paradigms
  • discuss modelling process
  • discuss error sources in modelling
  • discuss the process of  model calibration
  • discuss the process of model validation
  • discuss model performance criteria
  • discuss different  approaches used in urban drainage modelling

Things to Do:

Last modified: Wednesday, 5 December 2012, 4:16 PM